Single down-line deployment via standard industry practices

  • All equipment within ISO frame (8′ x 8′ x 40′), gross weight 50 tons
    • Install vessels readily available
    • Larger operations may have vessels in-field/under contract
  • Over-road ‘truckable’
  • Standard, interchangeable¬†units designed to be swapped out with ‘refreshed’ unit
    • Significantly reduce ‘on-water time’
    • Lower IMR cost
    • Ability to upgrade as well production changes